Preliminary model search
Use the multilingual Finder when the application, water class and required output are already known.
Open Watermaker FinderSTART A SEAMASTER PROJECT · CWG ENGINEERING
Send the source, application, required output and site conditions. The first review identifies the correct DESAL route, missing inputs and next engineering step.

Braće Radića 132
10410 Mraclin-Velika Gorica
Croatia
STRUCTURED PROJECT INTAKE
Nominal capacity alone is not enough. Source-water chemistry, required product quality, operating window and physical interfaces determine the appropriate desalination architecture.
WHAT TO PREPARE
If information is not yet available, state it clearly. The first review can identify which measurements, analyses or site details are required before final selection.

CHOOSE THE FASTEST ROUTE
Use the multilingual Finder when the application, water class and required output are already known.
Open Watermaker FinderSend the current laboratory report when source chemistry or pretreatment requirements need technical review.
Send water analysisUse the structured inquiry for commercial, industrial, municipal, marine or containerized system requirements.
Start project briefOFFICIAL CWG CONTACT
SEAMASTER is the specialized desalination platform of CWG d.o.o. The details shown here follow the official CWG contact page.
Visit official CWG contact pageBraće Radića 132
10410 Mraclin-Velika Gorica
Croatia
PROJECT CONTACT FAQ
Start with the application, project location, source-water type, required output and intended water use. If available, attach the current laboratory analysis, installation drawings, equipment-room dimensions and photographs.
A preliminary route can be discussed, but reliable pretreatment, recovery, membrane duty, materials and performance cannot be finalized without sufficient source-water data. The team can identify the analysis required for the next step.
Yes. State the destination, electrical supply, climate, applicable project standards, logistics and expected service scope. The final proposal confirms the actual supply and documentation boundary for that location.
No. The Finder provides a preliminary catalog starting point. A technical and commercial proposal follows review of the actual source, duty, installation and project requirements.
READY TO DEFINE THE WATER SERVICE?
Use the structured project brief or contact CWG directly for the next engineering step.