Intake & discharge
Define seawater collection, screening, hydraulic conditions and concentrate interface.
DESAL-SWRO XL · PROCESS ARCHITECTURE
Connect intake, pretreatment, high-pressure RO, energy recovery, product-water conditioning, CIP and controls around the verified seawater and final duty.

PROCESS ARCHITECTURE
Two projects with the same product flow may need different pretreatment, materials, train arrangements, controls and post-treatment. XL architecture is fixed only after source and site risks are understood.
ENGINEERING FRAMEWORK
Each item becomes part of the design basis before equipment, guarantees and commercial scope are frozen.
Define seawater collection, screening, hydraulic conditions and concentrate interface.
Select filtration and chemical conditioning from turbidity, SDI, scaling and fouling risks.
Select pump, control and energy-recovery architecture for the approved design point.
Set membrane array, flux, recovery and parallel-train arrangement from the projection.
Define stabilization, remineralization, disinfection, storage and distribution interfaces.
Integrate flushing, cleaning, instruments, alarms, trends and remote supervision.
CONTROLLED DATA BOUNDARY
The current approved source confirms the XL range and engineering position. It does not establish public intermediate models or a universal technical schedule.
DESAL-SWRO XL FAQ
No. The public range does not define one universal equipment train. Pretreatment, membranes, recovery, materials, energy recovery, post-treatment and automation remain project-specific.
The approved public engineering envelope is 36–600 m³/day, equivalent to 1,500–25,000 L/h. No discrete XL model list is currently approved.
No confirmed public XL price list is established. Final price, tax treatment, delivery and supplied scope are issued in the CWG project proposal.
Container delivery can be evaluated after the process, equipment layout, access and site battery limits are defined. Confirmed BOX DESAL catalog platforms are available separately from 100 to 1,200 m³/day.
READY FOR DESAL-SWRO XL ENGINEERING?
CWG will define the process, design capacity, train architecture, interfaces, guarantees and final commercial scope.