Water analysis
Provide salinity, temperature, suspended solids, scaling ions, organics and biological indicators.
DESAL-SWRO XL · PROJECT DESIGN BASIS
Prepare the water, demand, final-quality, site, utility, availability and delivery information required before SEAMASTER can issue an accountable XL proposal.

PROJECT DESIGN BASIS
The design basis records what the plant must treat, produce, withstand and connect to. Missing information is identified openly rather than replaced by assumptions inside the final guarantee.
ENGINEERING FRAMEWORK
Each item becomes part of the design basis before equipment, guarantees and commercial scope are frozen.
Provide salinity, temperature, suspended solids, scaling ions, organics and biological indicators.
State daily volume, peaks, operating hours, seasonal variation and storage philosophy.
Define potable, process or utility targets and required post-treatment compliance.
Describe source reliability, intake hydraulics, discharge route and permitting boundary.
Confirm power, footprint, climate, access, drainage, civil works and connection conditions.
Set redundancy, automation, documentation, testing, commissioning and battery limits.
CONTROLLED DATA BOUNDARY
The current approved source confirms the XL range and engineering position. It does not establish public intermediate models or a universal technical schedule.
DESAL-SWRO XL FAQ
No. Flow is only one input. Guaranteed performance and final scope require current water data, operating conditions, final-water specification, site interfaces and availability requirements.
The approved public engineering envelope is 36–600 m³/day, equivalent to 1,500–25,000 L/h. No discrete XL model list is currently approved.
No confirmed public XL price list is established. Final price, tax treatment, delivery and supplied scope are issued in the CWG project proposal.
Container delivery can be evaluated after the process, equipment layout, access and site battery limits are defined. Confirmed BOX DESAL catalog platforms are available separately from 100 to 1,200 m³/day.
READY FOR DESAL-SWRO XL ENGINEERING?
CWG will define the process, design capacity, train architecture, interfaces, guarantees and final commercial scope.