DESAL-SWRO PM-E · CONTROLLED TECHNICAL DATA BOUNDARY
PM-250-E
1,041.67L/h
A higher-output PM-E configuration published only with the fields confirmed in the approved product master.

CONFIRMED MASTER RECORD
Six public reference fields. Everything else waits for evidence.
This page deliberately avoids a false impression of completeness. The confirmed catalog record is enough for preliminary capacity comparison, not for procurement or final engineering.
Check preliminary capacityPRODUCTION PLANNING
Nominal volume by operating time.
The calculation multiplies catalog output by runtime. It does not create a performance guarantee where operating conditions are not defined.
MISSING TECHNICAL FIELDS
No adjacent-model assumptions.
PM-A, PM-B and PM-C values are not reused for this PM-E record. The following items require a selected-code technical datasheet or approved CWG proposal.
DESAL-SWRO-PM-250-E FAQ
What can—and cannot—be concluded.
01What is confirmed for DESAL-SWRO-PM-250-E?
The approved master confirms 1,041.67 L/h, 25,000 L/day, a 56,000 µS/cm maximum feed-conductivity reference, no VFD, public code STD-0111 and a €45,345 approved net price.
02Why are pump and dimension fields not displayed?
They are not present in the approved PM-E master records. Values from PM-A, PM-B or PM-C are not transferred to PM-E because configuration and equipment can differ.
03Does no VFD confirm the electrical supply?
No. VFD status and power supply are separate fields. The source confirms no VFD but does not confirm voltage, phase arrangement, frequency, connected load or protection requirements.
04Is the catalog capacity guaranteed?
No. It is a preliminary catalog value. Guaranteed production requires seawater analysis, temperature, intended operating hours, intake conditions and an approved technical proposal.
05What does the approved net price include?
It is the approved net equipment price, excluding VAT and transport, EXW CWG Croatia. The final technical scope requires project approval.
READY FOR PM-E CONFIRMATION?
Request the selected-code technical scope.
Send seawater analysis, required output, operating hours, electrical supply and installation constraints to CWG.