01·YACHTS & MARINEFresh water onboard
Yachts & Marine
Compact footprint, DC power, low-noise operation and dependable freshwater production at sea.

APPLICATION-BASED DESALINATION ENGINEERING
Eight application pathways connect your water source, daily demand and operating conditions to the correct SEAMASTER product family.
A yacht prioritizes footprint and power. A hotel prioritizes peaks and reserve. Industry prioritizes uptime and water quality. Municipal supply prioritizes resilience and operator access. The application defines the duty; the water analysis selects the treatment route.
CHOOSE YOUR APPLICATION
Open each sector to compare its operating challenge, typical water source, capacity envelope and recommended product families.
APPLICATION SELECTION MATRIX
Use this matrix as the first filter, then verify water quality, daily production, operating schedule and installation conditions.
| Application | Typical source | Primary design driver | Starting product family | Final gate |
|---|---|---|---|---|
| Yachts & Marine | Seawater | Footprint, DC power, noise | DESAL YACHT / DESAL-SWRO PM | Marine installation review |
| Villas & Homes | Brackish / seawater | Occupancy, storage, automation | DESAL-BWRO Q / XP or PM-C | Water analysis |
| Hotels & Resorts | Brackish / seawater | Peak demand, reserve, seasonality | DESAL-BWRO KP / PM-C / XL | Demand schedule |
| Islands & Remote Areas | Brackish / seawater | Autonomy, availability, logistics | DESAL-BWRO / PM-C / XL / BOX | Remote-site design basis |
| Camps & Temporary Sites | Brackish / seawater | Occupancy phases, storage, mobilization | DESAL-BWRO / PM-C / XL / BOX | Phased demand schedule |
| Industry | Brackish / seawater | Uptime, redundancy, product quality | DESAL-BWRO KP / DESAL-SWRO XL | Process specification |
| Irrigation | Usually brackish | Salinity, ions, crop sensitivity | DESAL-BWRO Q / XP / KP | Water + agronomy review |
| Municipal Supply | Brackish / seawater | Resilience, storage, operator access | DESAL-SWRO XL / BOX DESAL SWRO | Potable-water requirements |
FOUR INPUTS BEFORE ENGINEERING
The correct product family becomes clear when four project inputs are defined at the same time.
Choose the sector, feed-water class and required capacity. The Finder identifies the smallest qualifying catalog model before final engineering.
APPLICATION FAQ
No. The application defines the duty and installation priorities, but the final system also requires measured feed-water quality, daily demand, operating hours, product-water specification, power supply and site conditions.
Choose the technology from the actual feed water. DESAL-BWRO covers defined brackish-water conductivity classes, while DESAL-SWRO is engineered for seawater duty. A current analysis is required whenever the source is uncertain or seasonally variable.
Add all realistic daily uses, define the available operating hours and storage volume, then include a design reserve. The hourly RO requirement is not the same as the site's peak instantaneous consumption.
BOX DESAL is appropriate when the project benefits from factory integration, weather protection, reduced site assembly and a defined delivery battery limit. Site intake, product storage and discharge interfaces still require coordination.
No. The Finder provides a preliminary catalog starting point. Guaranteed capacity, recovery, permeate quality, pretreatment and energy demand are confirmed only after engineering review.
READY TO DEFINE THE APPLICATION?
We will connect the application to the correct DESAL family and identify the data required for final engineering.